Mill Dam Park Phase II Proposed Improvements – Green Acres


Block 86, Lots 1, 2, 21 & 23
Township of Mount Holly, Burlington County, NJ


Currently, the improvements at Mill Dam Park are anticipated to include the addition of a third basketball court, lighting for all three (3) basketball courts, two (2) tennis courts with lighting, a splash park with shade structures, a pavilion, a comfort building with concession stand and storage, new tot lot equipment, HMA perimeter walkway with decorative lighting, video surveillance system, expansion of the existing parking lot, the demolition of the existing hockey rink and maintenance building, and relocation of the existing softball field equipment. Improvements will also include new benches, picnic tables, landscaping, shade structures, water fountain, and other associated amenities.

Click here to see a concept of the possible layout: